Welcome to Basingstoke College of Technology

Investing in Science and Engineering

New look college for September

Work has begun on BCoT’s £3 million investment in its buildings and facilities on the South site in Worting Rd. The re-vamp of the college fascia will be ready for the start of term in September when BCoT will welcome its new wave of students. The Technology centre will be ready at the end of November. Engineering and Automotive students will start their programme at our BETA centre and then will move into the brand new centre at the start of the spring term in 2012.

The refurbishment has been designed by Basingstoke architects Design ACB Ltd who have worked closely with the BCoT team throughout the consultation process.  The revamp will see a renovation of the main building on the South site and a complete overhaul of the Engineering and Automotive block.

External render - image courtesy of Design ACB Work will include a widening of the entrance steps to both the North and South sites along Worting Road to improve access and ease circulation around both campuses.  All improvements will adhere to DDA (Disability Discrimination Act) guidelines and reflect  BCoT’s commitment to equality and diversity for all staff and students.

External render - image courtesy of Design ACBThe refurbishment and extension of the Engineering and Automotive block will  bring an increased focus on innovation and technology and will also combine Science and Maths subjects. The aim is to make BCoT a centre of excellence for Technology, reinforcing the college’s extensive links with industry.

BCoT Principal Anthony Bravo, says:

“I am thrilled that work has begun on the redevelopment programme at the college. The refurbishments will greatly improve the appearance of buildings, enhance the overall learner experience and  ensure that BCoT is one of the best learning centres for technology in our region.”

Dominic Gaunt, Director of Design ACB says:

“We are delighted to have been working with the College on these improvement which will offer wonderful new spaces within which to learn.  The works to the frontage will improve the environmental performance whilst making a significant visual improvement to Worting Road.”

If you have any queries or for further information on the project, please contact Hazel Jones, Head of Estates & Facilities on 01256 306320 or email Hazel.Jones@bcot.ac.uk

The BCoT Revamp includes:

  • New fascia on the South site
  • Welcoming entrance
  • Extension and re-kit of the Engineering and Automotive blocks
  • A new entrance foyer at the West of the building demonstrating college facilities, equipment and industry links
  • An exhibition space for student’s work and showcase motor vehicles
  • Accessible for people with disabilities

imagery courtesy of ACB Design

Beta for Engineering Industry training
Beta for Engineering
Industry training

Apprenticeships at BCOT
Apprenticeships at BCOT